Delhi · 2012 · Act 4
Delhi Water & Sewer (Tariff & Metering) Regulations, 2012
In forceFull text
This Act is not split into sections here yet, so this is the full text read from its official PDF. Older scans can carry reading errors: check the PDF before you quote it, and for tables and schedules.
F.No. Dated: July, 2012
Delhi Water & Sewer (Tariff and Metering) Regulations, 2012
Regulation 1
Regulation 2
Regulation 3
Regulation 4
Regulation 5
Regulation 6
Regulation 7
Regulation 8
Regulation 09
Regulation 10
Regulation 11
Regulation 12
Regulation 13
Regulation 14
Regulation 15
Regulation 16
Regulation 17
Regulation 18
Regulation 19
Regulation 20
Regulation 21
Regulation 22
Contents Page
Chapter I
Preliminary
Short title and commencement
Definitions
Chapter II
Water and Sewer Connection
Water connection
Sewer connection
Application from consumer
Procedure for sanction of water and sewer connection
Temporary water connection
Category of Consumers
Chapter III
Billing
Tariff
Billing cycle
Issuance of bills by the Board
Provisional billing
Billing in case of non-functional water meter
Billing in Special case
Billing of arrears against several occupiers
Disputing the veracity of measurement
Change in use of water
Charges in case of new construction
Dishonour of cheques
Liability to pay outstanding dues of the Board
Payment to be made by due date
Board to issue receipt for all payments
Regulation 23
Regulation 24
Regulation 25
Regulation 26
Regulation 27
Regulation 28
Regulation 29
Regulation 30
Regulation 31
Regulation 32
Regulation 33
Regulation 34
Regulation 35
Regulation 36
Regulation 37
Regulation 38
Regulation 39
Regulation 40
Regulation 41
Regulation 42
Regulation 43
Regulation 44
Regulation 45
Regulation 46
Regulation 47
Regulation 48
Regulation 49
Chapter I'V
Metering
Provision of water meters by the Board
Security for water meters provided by Board
Meter Rent and Safety of water meters
Repair and maintenance of water meters
Location of water meter
Access to water meter
Replacement of water meter in certain situations
Testing of water meter
Chapter V
Miscellaneous
Connection generally from nearest distribution line
Water pipe not to be used for carrying water from other sources
Only licensed plumbers to be engaged.
Disconnection of illegal water connection
Regularisation of unauthorised water connection
Regularization of unauthorised sewer connection
Supply of water through mobile water-tankers
Supply of treated waste water
Disconnection of water supply on consumer request
Disconnection of water supply by the Board
Restoration of water supply
Disruption in normal supply of water
Stoppage or reduction in water supply during emergent situations
Unusual drought, war or other accidents
Written notice to Board where use of water is stopped by
consumer
Duty of consumer in certain conditions
Duty of consumer to stop wastage of water and report the same.
Duty to intimate change of ownership or occupancy
Mutation
Regulation 50
Regulation 51
Regulation 52
Regulation 53
Regulation 54
Provision for rainwater harvesting is mandatory
Incentive to citizens
e-Service Level Agreement
Information provided by the Board on website
Delegation of power
SCHEDULE I
Annexure I (A)
Annexure I (B)
Annexure I (C)
Application Form for New Connection
Disconnection/ Opening Form
Mutation Form
Annexure II
Annexure I
Annexure II
Annexure III
Annexure IV
Annexure V
Annexure-VI
Annexure I
Annexure II
Annexure -III
Annexure IV
- Misc. fee to be levied with new connection.
SCHEDULE II
- Structure of tariff.
- Rates of additional sewer charges.
- Rates of Sewer maintenance charges.
- Rates of development charge
- Rate of concession given to certain categories/utilities in
respect of development charges.
- current policy regarding development charges
SCHEDULE II
- Rate of Cost of Water on construction.
- Authority for calculation of Infrastructure Charges
- Time limit fixed under e-SLA for various activities.
- Jurisdiction of various authorities for disputed cases
File No.
Dated:
DELHI JAL BOARD
Delhi Water & Sewer (Tariff and Metering) Regulations, 2012
In exercise of powers conferred by Section 109 of the Delhi Water Board Act, (Act
No. 4 of 1998), the Board hereby makes the following Regulations, for water & sewer
tariff and for metering, and for matters connected therewith and incidental or ancillary
thereto.
Chapter — I
Preliminary
1. Short Title and Commencement.
(a) These Regulations may be called “The Delhi Water & Sewer (Tariff and
Metering) Regulations, 2012.
(b) These Regulations shall come into force from the date of its issuance by the
Board and subject to Section 109(3) of the Delhi Water Board Act,1998
2. Definitions
In these Regulations unless there is anything repugnant to the subject or context:-
(a) ‘Act’ means the Delhi Water Board Act, 1998 (Delhi Act No. 4 of 1998);
(b) ‘Board’ means the Board as defined in the Act;
(c) ‘Bill’ means an instrument reflecting the demand raised for the services
rendered by the Board.
(d) ‘Billing cycle’ means the period for which bill will be raised by the Board;
(ce) ‘Bulk connection’ means sanctioned connection for bulk supply of water
through a ferrule size of more than 6.4 mm;
(f) ‘CEO’ means the Chief Executive Officer of the Board;
(g) ‘Cess’ means the cess as defined in Water (Prevention & Control of
Pollution) Act, 1976
(h) ‘Consumer’ means any person using services provided by Board such as
piped water supply, water supply through tanker, sewage facility, bio gas
facility or treated effluent and shall include corporate body, public and private
institution, firm, or establishment availing of such facilities.
(1) ‘Domestic individual connection’ generally means connection for supply of
water through a ferrule size of 6.4 mm.
(j) ‘Illegal connection’ is that connection which is taken by a person from rising
main or transmission main without any sanction or from the service line of
another consumer, which cannot be regularized by the Board.
(k) ‘Meter? means a mechanical/Electronic device for recording volumetric
consumption of water, bio-gas and treated effluent during any specified
period.
(I)
(m)
(n)
(0)
(p)
'Property’ means premises consisting of any land or building as defined in
Section 2(aa) of the Act and for purposes of these_regulations is used either
for domestic or non-domestic or mixed-use purpose.
‘Service pipe’ means the pipe which extends from the Board's distribution
line to the water meter of the consumer;
“Temporary connection’ means connection provided for any temporary use
upto three months subject to deposition of the charges;
‘Unauthorized Connection’ means any connection installed on water
distribution pipe line without the proper sanction of the authority and/or
without due payment of required initial charges which can otherwise be
regularized;
‘Zonal Revenue Officer’ is an officer of the Board who is authorised to carry
out such functions on behalf of the Board as are or may be delegated to him;
All other words and expressions used in these regulations and not defined herein
but defined in the Act shall have the meaning respectively assigned to them under
the Act or in absence thereof, the meaning as commonly understood in the water
supply industry.
Chapter I
Water and Sewer Connection
3. Water Connection
(a)
(b)
(c)
(cd)
(€)
(f
(g)
(h)
(i)
A regular connection shall be considered, on receipt of an application in the
prescribed format as provided in Annexure-l of Schedule-I hereto alongwith
requisite documents and fees as prescribed in Annexure-Il of Schedule-[.
Application may be made by the owner/occupier of a property once the
construction is completed in that property or by the owner/occupier of such
premises where Board has provided/ extended water distribution system in
that area after the construction provided that such construction is authorized
one.
No person is authorised or allowed to draw water from Board’s water system
by any means other than through sanctioned water connection.
No regular connection will be allowed in a vacant plot/prece of land.
No individual connection will be sanctioned to any flat or house tn a co-
operative group housing society’ apartment complex or other domestic/non-
domestic complexes where bulk connection either exists or is required to be
given under the policy in force of the Board.
No water connection will be sanctioned for the basement of any building.
Individual water connection will be sanctioned for a single dwelling unit /
floor subject to maximum of six in a property.
Assessment of technical feasibility and sanction of Bulk water connection
whl be the jurisdiction of Executive Engineer concerned. ZRO will forward
the file accordingly after completing the formalities.
Water supply shall not be provided unless arrangement for proper disposal of
waste water exists.
4, Sewer Connection
(a} Wherever sewage system is in existence and maintained by the Board, it
shall be mandatory for a consumer to cbtam a sewer connection by
submitting application in the format prescribed in schedule-t after paying
requisite fee and charges, failing which, besides disconnection of water
supply bill will be raised to such consumer in respect of Sewer charges
and/or Development Charges.
(b) Application may be made by the owner/occupier of a property once the
construction is completed in that property or by the owner/occupier of
premises where Board has laid sewerage facilities in a particular locality
after the construction; provided such construction is authorized.
(c) No person is authorized or allowed to put sewage in Board sewerage system
other than through sanctioned sewerage connection.
(d} No regular sewer connection will be allowed in a vacant plot/piece of land.
(e} No individual connection will be granted to any flat or house in a co-
operative group housing society/apartment complex or other domestic/non-
domestic complexes where bulk connection either exists or is required to be
given under the policy in force of the Board.
(f} No Sewer connection will be sanctioned in the basement of any building.
&
CF
R
6.
Applications from consumers
AU applications for new water and sewer connection, additional connection,
change of size of connection, reopening and disconnection, replacement of water
meter, mutation shall be made to the Zonal Revenue Officer in the formats
prescribed in scheduie-L.
Procedure for sanction of Water and Sewer Connection
(a) Any person whe is resident of territorial jurisdiction of Board and where
services are maintained by the Board, is eligible to apply for new
connection under regulation 3 and 4, subject to following conditions:
i) Technical feasibility for providing services should exist.
i} Applicant is required to attach the identity proof and ownership/
occupancy proof and no objection certificate from owner m case
of tenant with the application.
i) There should not be any outstanding dues towards the Board
against the property on account of water/ sewer/ development/
infrastructure charges etc.
iv} In case there are more than one occupier/ owner then the
outstanding arrears/ dues in respect of the share amount will be
paid by the applicant. ZRO will assess and prepare a site report
before levy such share arnount.
v) Apphcant is bound to abide by the conditions mentioned in the
application form and is required to pay the fees, security deposit
or any other charges as applicable or as may be levied by the
Board from time to time. The sanction of connection in any
premises does not acknowledge or confer any title, ownership or
occupancy right in favour of the applicant.
(b) Water shall be supplied, subject to technical feasibility, through sanctioned
appropriate sized ferrule in consonance to the estimated water consumption
of the consumer.
(c) Subject to the fulfilment of above mentioned requirements and approval of
ZRO/ competent authority, a new connection may be sanctioned. Applicant
is required to make payment of the demand raised by the ZRO office, which
shall be deposited within a period of fifteen days failing which a fresh bill
will be issued.
(d) The consumer will be given a boring date and time by ZRO under intimation
to JE concerned when the consumer is required to get connection installed on
the Board distribution line through a licensed plumber or any agency having
licenced plumbers of the Board. Execution of the work by other than a
licensed plumber shall lead to levy of penalty provided in Schedule [V of the
Act,
(ec) Wherever it is found that the installation of connection has been done in
contravention of the sanction, such as fixation of ferrule of a size other than
the sanctioned one, or through unauthorized person or the work 1s executed
on any other date than the prescribed one, such boring will be treated as
unauthorized and the sanction is hable to be withdrawn, in addition to
imposition of penalty as provided in Schedule [V of the Act.
Provided that in case consumer gives sufficient reason for not executing the
work on the specified date he may approach ZRO within 15 days, grving
reasons for the failure and request for grant of another boring date, in which
case, ZRO upon berng satisfied, may give new date for boring.
(} In case of detection of unauthorized connection at the property, where
connection has been applied for, consumer is required to get such
unauthorized connection regularized first in applicable category by paying
penalty, water charges for three years and water connection charges, failing
which such connection may be cut off, besides issuance of challan and
withholding of sanction for new connection.
(eg) lt would be open for the Board to provide a certificate in respect of the
availability/ adequacy of water and sewer system in a property for purpose of
sanction of building plan by the Municipal Corporations of Delhi/ DDA or
any other competent authority.
Ve Temporary water connection
a} A temporary water connection may be applied for in the format prescribed
for regular conmection mitially for a period not exceeding three months,
subject to technical feasibility, provided that applicant pays prescribed
security deposit for the period tor which such connection is apphed. Such
connection is renewable maximum for another period of three months.
b}) Applicant will apply for such connection by submitting his application
alongwith authorization letter and identity proof and security amount for the
entire period for which water connection has been applied. Amount will be
assessed on the basis of estimated consumption assessed by area Executive
Engineer or Joint Director (Revenue) concerned.
¢c) Such connection may be allowed in vacant plot or temporary shed, for
holding a fair, function, circus, or such events where large number of people
are expected to attend.
d} Subject to availability of sufficient quantity of water, such water connection
tor construction purposes (new or additional}, may be allowed by ZRO after
consulting area Zonal Engineer. In such case, charges as mentioned in
Annexure | of Schedule HI hereto will be applicable, which were calculated
by area ZE. However, such connection cannot be claimed as a matter of
rignt.
e) Al other provisions as applicable to the regular consumer will be applicable
to such connection also.
f) It will be the duty of the consumer to get his temporary connection
disconnected through a licensed plumber or authorised agency of the Board
after expiry of the sanction period and clearing all the arrears, failing which
consumer will be hable to pay the penalty in addition to the arrears.
8 Category of consumer
Board shall classify consumers in different categories according to nature of use of
water and/or activities undertaken at the premises of the consumer for the purposes
of tariff.
The broad classification is as under:-
D)
cy
Residential (A): Water supplied to such plot/property which 1s used purely
for residential purpose.
Partially Residential/Mixed (8): Water supplied to such residential
buildings where commercial activity having non-intensive use of water
exists, such as private clinic, consulting chambers, shops, Atta Chakit,
property dealer’s office etc.
For Group Housing Societies and Apartments with one bulk connection for
water, the dwelling units which are having mixed use activity, shall be
charged at tariff apphcable for mixed use rates after taking average
consumption for each unit. The office bearer with meter reader will assess
such units after every two billing cycles.
Industnial/Commercial (C)}:- Water supphed to plot/preperty where
intensive use of water is envisaged such as institutes, hospitals, schools,
offices, office complexes, Raihway Stations/ yards, Police Stations,
Airports, Bus- stand, Petrol Pumps, Hotels, restaurants, clubs, marriage
halis, industry, cooling plants, factories, 1ce cream factory, amusement
parks dhobt ghat etc.
Water supphed to properties having provision of ether rain water
harvesting or waste water recycling or both (D)
i) Such plot/properties which are having area of 2000 square meter or
more and having installed functional rain water harvesting system or
waste water recycling system, shall be granted rebate of 10% in the
total bill ammount and 15% if both the above systems have been set up
and functional.
i} Ifthe Rain Water Harvesting system is adopted by a society then the
individual member of that society will be entitled to above mentioned
rebate in water bill,
ui) The area Zonal Engineer or such other suitable agency as authorized
by the board will provide a functional certificate im respect of the
above systems mentioning therein that substansive portion of the
plot/ property has been covered as far as Rain Water Harvesting is
concerned. Similarly, he will certify that substantive quantity of the
waste water generated has been recycled by the consumer. A
certificate will be issued after every six months.
9
9. Tariff
a)
b)
d)
©)
f)
h)
y
Dp
Chapter — U1
Billing
Board shall levy tees, charges, rentals, development charges, infrastructure
charges, collect deposits and may recover interest on amounts payable to it
but not paid within time, at such rates as may be specified in Annexure I of
Schedule Uf hereto for the services rendered by it.
‘Water Advance’ means the adjustable amount levied at the time of
sanction/regularization of water connection to a domestic individual
consumer which wil be as per Annexure H of Schedule-L. The amount is
adpustable at the time of surrender of the connection or in the event of default
by the consumer, due to non-payment of Board charges.
“frade Advance’ means the adjustable amount levied at the time of sanction/
regularization of water connection in a commercial/ industrial category @ of
three months estimated consumption of the applicant as assessed by ZRO as
per site conditions. The amount is adjustable at the tune of surrender of the
cornmection or in the event of default by the consumer, due to non-payment of
Board charges.
‘Occupier Security’ is the amount levied from a person, who is a tenant or
doesn’t have any legal ownership right. The amount is mentioned in
Annexure-Ul of Schedule-t
“Volumetric charge’ is the monthly charge levied for the volumetric quantity
of water consumed in kilo-liters as recorded by the meter or as fixed by the
#RO/ Competent Authority in case of non-functional meters. This charge
will be levied as per the slab rates shown in Schedule Ef hereto.
‘Sewer charge’ is the monthly charge levied for collection and treatment of
the sewage. Currently, it is 60% of the charges of volumetric consumption of
the water.
‘Service charge’ 1s a fixed monthly charge levied for maintaining the
services in the locality as per the slab rates shown in Annexure-I of Schedule
Hf hereto. This charge shall be payable in the lowest slab in the respective
category even if no water is consumed during a billing cycle.
‘Additional sewer charge’ is levied from consumer who are usme ground
water and/or water from any other source in addition to the water supplied by
the Board, thus generating more sewage as compared to the volumetric
consumption recorded by the meter, as per the rates prescribed in Annexure-
Hoof Schedule-H.
‘Sewerage maintenance charge’ is levied from the owner/occupier of such
properties whose Board water connection is etther lying cut off or no
connection exist but who are using ground water or water from other sources
and discharging sewage into the Board sewerage system, on such rates as
prescribed in Annexure-Hl of Schedule ff hereto
‘Development charge’ shall be levied one time from properties situated in
such locality where water and/or sewerage facilities have been extended by
the Board without any grant/ non-refundable aid by the Government. The
id
k)
charges shall apply as per rates prescribed in Annexure EV of Schedule Il
hereto. Such charges shall be levied on the basis of per square meter area of
the plot/property from the date of notification issued in respect of that
locality. The copy of existing policy is placed as Annexure-VI of Schedute-
Hf. In case of delay in payment of development charges, interest as provided
in the notification shall be levied. Board may provide rebate on the interest or
concession to any particular category of the consumers as mentioned in
Annexure V of Schedule U hereto.
‘Infrastructure charge’ are levied on the developing agencies as well as on
the individual owner of plot/property size of 200 square meters or more at
the time of approval of water/sewer schemes as per the procedure and by the
authority a5 prescribed in Annexure-H] of schedule-ILf for loading additional
burden on the system of the Board. It is calculated on the average daily
demand of water in liters. Currently, the charges are Rs.30/- per liter.
However, in case a new butlding is constructed with four storeyed or on
plot size of 200 sq. mtr. Or more, the old connection will not be reopened
without payment of Infrastructure Charges.
16. Billing Cycle
Billing cycle may be monthly, bimonthly or quarterly, depending upon practical
feasibility. Board may alter Billing cycle for any consumer after giving notice in
this regard.
Ti. issuance of bills by the Board.
a}
b)
?
c)
e}
1)
The bill issued in respect of services rendered by the Board may include one
or more charges as applicable and as prescribed in regulation 9 above.
Ifa property is having two or more water connections for different usages
then the occupier is required to maintain separate svstem of storage and
distribution for each usage of water connection. If the consumer fails to do
so, charges on all existing connections in the property shall be levied in the
highest category of use in terms of tart in that premises.
Bill shall be raised on the basis of consumption recorded by the meter. If ne
functional water meter was ever installed, the bill will be raised taking
minimum consumption of water as 25 Kilolitres per month per dwelling unit
or a5 assessed by ZRO, whichever is higher till a meter is installed on such
connection. However, consumer may appeal to Joint Director concerned in
case he is not satisfied with the decision of ZRO.
For group housing society, apartments and commercial/Industrial areas with
bulk connection, the consumption per connection per month shall be
calculated on the basis of average consumption for each occupied house/
dweHing/ industrial or commercial unit for the purpose of billing. Fixed
monthly charges will be levied against all units. Board shall recover the
charges from the society and not from the individual members of the housing
society,
“Pemporary Connections’ will be billed on Industrial/ Commercial rates.
‘Unauthorized cormections’ which are in existence at the time of coming into
force of these regulations in otherwise technically feasible areas shall be got
regularized by the owners/occupiers after paying the requisite charges,
il
failing which the Board may issue bill in the name of occupier/owner
including the regularization charges. Such dues/ charges will be recovered as
per the procedure laid down under the Act. If such charges are not paid
inspite of sufficient opportunity to such occupier, water supply be
disconnected.
iz. Provisional billing
a)
b)
While recording the reading, if Meter Reader finds that reading should be
detained due to 100% deviation in consumption, unless the consumption is
less than or equal to 20 KL per month, during a billing cycle as cornpared to
the previous one, he shall inform the consumer and ZRO about the same. Tul
the consumer submits his explanation, provisional bill based on average
consumption of previous twelve months or such lesser period as available on
record, shall be issued. If consumer succeeds in establishing that such
consumption is not correct, the bill will be rectified otherwise consumer ts
required to pay the bull as per the consumption recorded by the meter reader.
ifa water meter box or premises ts found locked, provisional bill on the basis
of average consumption of previous twelve months or such lesser period as
available on record shall be issued subject to adjustment on actual
consumption, whenever recorded.
13. Billing in case of non-functional water meter
(aya) Hf at the time of meter reading or as per the report of the consumer, the
water meter provided by the Board is found to be out of order and
consequently not registering the consumption, the average consumption
of previous twelve months or such lesser pertod as available on record
shall be taken as the basis of billing. However, Meter Reader and/or
consumer will inform the ZRO about such meter and ZRO will take
immediate steps to replace tt.
(it) Hf at the time of meter reading any private water meter is found to be out
of order and consequently not registering the consumption, the average
consumption of previous twelve months or less period as available on
record shall be taken as the basis for billing. HW the meter is not replaced
by the consumer within two months from the date of notice of detault,
then the highest average of the consumption recorded during last twelve
months period or such lesser period as available on the record when the
meter was functional shall be taken as the basis for issuing the bill, till
the meter ts replaced.
(b}) Notwithstanding anything contained in these regulations if, during two
consecutive billing cycles reading of the meter is not possible due to no
response from occupier or locked premises or reading is not allowed
deliberately, the consumption shall be computed on any one or more of
the following basis as may be decided by the ZRO after recording the
reasons i writing.
G) On highest of registered consumption per month during last
twelve months period or highest per month consumption of such
lesser period as available on record, or